Quick answer

A reputation management progress report covers six sections: SERP movement against priority queries, AI narrative state across the eight engines AIQ™ monitors, Wikipedia activity, peer benchmarks, work completed, and prioritized recommendations with wins and risks. Every section ties back to the agreed program goals, and the report separates inputs (work done) from outputs (measurable change).

Monthly progress reports at Five Blocks use the same six-section structure, tied to the goals set at the start of the engagement. Each section maps to one reputation layer and connects the work performed to the change it produced.

Annotated diagram of the six sections of a Five Blocks monthly progress report — SERP movement, AI narrative state, Wikipedia activity.
Monthly progress report structure: six sections each mapped to a distinct reputation layer, with every section tied back to the engagement goals agreed at program start. Inputs (work done, §5) are distinguished from outputs (measurable change, §1–4 and §6); durable change typically lags work by weeks to months.
SERP movement
Priority-query rankings tracked at daily resolution through IMPACT™, with specific URL gains and losses called out. Charts show composition shifts, owned, earned, third-party, and hostile share, so the trend is easy to read rather than buried in tables.
AI narrative state
Sentiment trend, source-attribution shifts, and emerging or fading themes across the eight AI engines AIQ™ monitors: ChatGPT, Copilot, Gemini, AI Overview, Perplexity, Grok, Claude, and Google AI Mode. The engine-by-engine comparison shows where the narrative is improving and where it needs attention.
Wikipedia activity
Any Talk-page work filed or accepted, edit notifications from WikiAlerts™, reverts, and a current summary of article health. Flags anything that needs a response before the next reporting cycle.
Peer benchmarks
The client’s position relative to the named peer set across each layer: SERP share of voice, AI narrative quality, Wikipedia presence, Knowledge Panel completeness. Peer-relative data is often more useful than absolute numbers alone.
Work completed
The inputs for the period: source-level interventions, content built, profile work, entity-layer changes, technical changes. This section separates what was done from what moved. Durable change often lags the work by weeks to months.
Recommendations and risks
Three to five prioritized recommendations for the coming period, a short list of wins, and risks to flag for leadership. Visuals over text where they communicate better. The report is an operational document, not a marketing artifact.

Last reviewed: 19/05/2026

Work with Five Blocks

Five Blocks helps companies manage exactly this.

If this is a live issue for you, our team can help. Let’s talk about your situation.

Talk to our team

Tell us a little about your situation and we will be in touch.

Held in strict confidence. We will respond promptly. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Skip to content